TEAM CRITICAL LIFE – Minutes 2/9/08

TEAM MEETING

AGENDA

  • Go through the client meeting what needs to be done
  • What needs to be done this week
  • Go over the change requests to be made

ABSENTEES - NIL

NOTES

  • Dylan to get the User Doc done ASAP, Blake needs to see it on Friday.
    • Need to discuss about the DVD section.
    • Get the template done and sent out ASAP
    • Present it in the client meeting (discuss DVD idea).
  • Put up the meeting details on the blog (they are on the team calendar)
  • Put transitions into the ends of both the videos and scenarios to guide the user to the next part of the clinic (module)
    • example at the end of the cut-scene a screen saying "Next go to Simulation 1"
  • Get into the cut scenes ASAP (get stuck in before the break) (Joel and Chaddy)
  • Get the codes (scripts) done by this week (Ben)
  • Luke has contacted Blake for 2 or 3 nursing students to do usability test (Dylan and Matt)
  • This Friday Meeting:
    • Second Life video;
    • run through of the documentation (and DVD discussion);
    • run through of usability test (organise the usability test);
    • sign off on changes;
    • talk about the oxygen level rules with Blake.
  • Test Plan review for next week (get done for the weekend - due officially in week 9) (Matt)
  • Make a flowchart that can be used as a texture in SL that gives the user an order for using the module (videos and simulations) (Ben - plan, Dylan - Beautification)
  • Need to make formal change docs for the changes that need to be made to the functional requirements to be signed off on Friday (sent out tonight in email)

ACTION

  • What needs to be done this week (and beyond)
  • Dylan
    • User Doc done ASAP (Template) need for Friday meeting (As above)
    • Beautify the flowchart
  • Matt
    • Test plan complete for meeting next week - we will go through a review of whats been done
    • Also need the usability tests for Friday meeting
  • Luke
    • Finish formal change document for the functional requirement changes being made
    • Send out in email tonight
    • To be signed off on Friday meeting
  • Ben
    • DO THE CODES!!!! Scripts to be finished (.....) by the end of the week
    • Do the plan for the flowchart and send to Dylan
  • Joel and Chaddy
    • Do the Cut - scenes (Videos)
    • Beautify the subtitles
  • Everyone
    • Do your Individual Review of another team's Document (find info on what document to be done in previous minutes)